Zanjan Gas Power Plant3
Zanjan Gas Power Plant3
Employer: Siloo Development
Consultant: Mapna - Design: Monenco Co
Structure Weight: 1'470 tons
Zanjan Gas Power Plant3 Specification
| Employer: | Siloo Development |
| Consultant: | Mapna - Design: Monenco Co |
| Supervision and Inspection: | Ghods Niroo, IEI, Mapna, Siloo Development |
| Structure Weight: | 1'470 tons |
| Accomplish: | - |
| Run Time: | - |
| Connection System: | Bolt and Nut - Welding |
| Color Type and Decolorization system: | Sandblast SA2 1/2 - 200 micron Final Epoxy Polyamide Color |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | - |