TUGA

TUGA

Employer: MAPNA Turbine Engineering and Manufacturing (TUGA)
Consultant: Noha Industrial Consulting Engineers & Sadr Sanaat Consultant
Structure Weight: 1.500 Tons

Project Photos

TUGA Specification

Employer: MAPNA Turbine Engineering and Manufacturing (TUGA)
Consultant: Noha Industrial Consulting Engineers & Sadr Sanaat Consultant
Supervision and Inspection: Ra'Dan Industrial Consulting Engineers
Structure Weight: 1.500 Tons
Accomplish: 2009
Run Time: 9 Month
Connection System: Bolt and Nut
Color Type and Decolorization system: Bolt Zinc Epoxy, 3 Layers, Sandblast SA2 1/2
Quality Control (QC): The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co
Other information: -
Go to Top

Photo / TUGA

Go to Top
Print Send to friend
pageup