The Third Millennium Towers (Millennium) are one of the most massive structures of steel structures in the Middle East.
Construction of this Steel Structure has been done by Baadband Co.
Third Millennium Towers Specification
| Employer: | Ashiyane Helicoupter Cooperative Housing Co |
| Consultant: | Mahan Meh Raz Consulting Engineers |
| Supervision and Inspection: | Tadbir Sahel Pars Consulting Engineers |
| Structure Weight: | 17'000 tons in 3 Block |
| Accomplish: | - |
| Run Time: | 36 months |
| Connection System: | Bolt and Nut |
| Color Type and Decolorization system: | 40 microns Alkyd Color, Sandblast Class 3 |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | Location: Tehran |