Pare Sar Combined Cycle PowerPlant
Pare Sar Combined Cycle PowerPlant
Employer: Nasb Niroo
Consultant: Mapna - Design: Monenco Co
Structure Weight: 1'857 tons
Pare Sar Combined Cycle PowerPlant Specification
| Employer: | Nasb Niroo |
| Consultant: | Mapna - Design: Monenco Co |
| Supervision and Inspection: | Mapna (Design & Development 2) |
| Structure Weight: | 1'857 tons |
| Accomplish: | - |
| Run Time: | 5 month |
| Connection System: | Bolt and Nut |
| Color Type and Decolorization system: | Sandblast grade Sa2 1/2 + 340micron Polyurethane final color |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | - |