Pare Sar Combined Cycle PowerPlant

Pare Sar Combined Cycle PowerPlant

Employer: Nasb Niroo
Consultant: Mapna - Design: Monenco Co
Structure Weight: 1'857 tons

Project Photos

Pare Sar Combined Cycle PowerPlant Specification

Employer: Nasb Niroo
Consultant: Mapna - Design: Monenco Co
Supervision and Inspection: Mapna (Design & Development 2)
Structure Weight: 1'857 tons
Accomplish: -
Run Time: 5 month
Connection System: Bolt and Nut
Color Type and Decolorization system: Sandblast grade Sa2 1/2 + 340micron Polyurethane final color
Quality Control (QC): The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co
Other information: -