Construction 10 units Casing - Niam2

Construction 10 units Casing - Niam2

Employer: Mapna Boiler
Supervision and Inspection: Mapna Boiler
Structure Weight: 3'700 tons

Project Photos

Construction 10 units Casing - Niam2 Specification

Employer: Mapna Boiler
Consultant: -
Supervision and Inspection: Mapna Boiler
Structure Weight: 3'700 tons
Accomplish: -
Run Time: 18 month
Connection System: Set Produce
Color Type and Decolorization system: Sandblast grade Sa 2 1/2 and 270micron Epoxy paint
Quality Control (QC): The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co
Other information: -