Construction 10 units Casing - Niam2
Construction 10 units Casing - Niam2
Employer: Mapna Boiler
Supervision and Inspection: Mapna Boiler
Structure Weight: 3'700 tons
Construction 10 units Casing - Niam2 Specification
| Employer: | Mapna Boiler |
| Consultant: | - |
| Supervision and Inspection: | Mapna Boiler |
| Structure Weight: | 3'700 tons |
| Accomplish: | - |
| Run Time: | 18 month |
| Connection System: | Set Produce |
| Color Type and Decolorization system: | Sandblast grade Sa 2 1/2 and 270micron Epoxy paint |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | - |