BETAJA
BETAJA
Employer: Bonyan Tose Hadi Co
Consultant: Asar Consulting Engineers
Structure Weight: 9.000 Tons
BETAJA Specification
| Employer: | Bonyan Tose Hadi Co |
| Consultant: | Asar Consulting Engineers |
| Supervision and Inspection: | Tadbir Sahel Pars Engineering Co |
| Structure Weight: | 9.000 Tons |
| Accomplish: | 2011 |
| Run Time: | 14 Month |
| Connection System: | Bolt and Nut |
| Color Type and Decolorization system: | Bolt Zinc Epoxy, 3 Layers, Sandblast SA2 1/2 |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | - |


