BETAJA

BETAJA

Employer: Bonyan Tose Hadi Co
Consultant: Asar Consulting Engineers
Structure Weight: 9.000 Tons

Project Photos

BETAJA Specification

Employer: Bonyan Tose Hadi Co
Consultant: Asar Consulting Engineers
Supervision and Inspection: Tadbir Sahel Pars Engineering Co
Structure Weight: 9.000 Tons
Accomplish: 2011
Run Time: 14 Month
Connection System: Bolt and Nut
Color Type and Decolorization system: Bolt Zinc Epoxy, 3 Layers, Sandblast SA2 1/2
Quality Control (QC): The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co
Other information: -